Monday, June 8, 2009







A lot has changed since our last post. But before we get to the good stuff here is where we are now.
All of the drywall has been installed but it has taken 2 weeks longer than expected. Most of the issues are due to our contractor not working on the necessary areas needed to move forward.
The texture is being completed SLOWLY but it is moving forward. The kitchen was to be completed first so the floor could be installed.












Finally after waiting weeks for the hardwood floor to be installed in the kitchen and den it is done. Our contractor has taken weeks to do what he said will only take days. In the meantime we have started some painting of rooms. Our master bedroom is almost done we hope to have the wood floor installed soon.