Saturday, January 24, 2009

THINGS ARE A CHANGIN!!!!!










The new bathroom on the first floor and the two baths on the second floor are now being framed. It is exciting to see walls being put in and not being torn out.











There were four floor joists on the first floor that needed to be replaced. They were rotten and split. Ken took up the original sub floor replaced the damaged joists and is replacing the sub floor.

The second floor bathroom framing and sub floors have been installed. It looks great and now we have to pick out faucets, cabinets and wow what a big deal it is to decide on a toilet.



Today we got the first look at what our new kitchen may look like. This is the preliminary drawing of our new kitchen.
Talk to you again soon.







No comments: